我非笼鸟未删减完整版在线观看,绿帽av,国产在线123,久色一区,开心激情综合网,日韩欧美在线综合网另类,亚洲高清一区二区三区

Strengthening

Location:Home>Strengthening

Siyuan Road Tunnel
2024-07-04 11:15:32

 The tunnel length of Nantong Seyuan Road Reconstruction Project is 3220m, and the buried section is 2670m long. The monitoring system adopts the integrated design of construction monitoring and operation monitoring, sharing monitoring hardware and data. This system sets surrounding loads and environment, deformation of main structure, force, etc.10 types of monitoring parameters,514 measuring points, in order to conduct real-time online monitoring, early warning and safety assessment of the tunnel structure during operation.


1595559770707370.png

Siyuan Road Tunnel